Equipment and telemetry
Inventory the source systems, available interfaces and sampling behavior. Identify asset IDs, timestamps, units and quality indicators before choosing an adapter approach.
RAIN / Software
Plan a read-only connection between existing site telemetry and RAIN’s local learning loop, with explicit adapter and validation requirements.
Integration planning · adapters scoped per pilot
01 / THE IDEA
The useful starting point is the telemetry available at your facility: what it measures, how it is sampled and who owns access. RAIN’s current implementation uses a battery-storage simulator. A catalog of production connectors is not published; each proposed site requires integration and validation work.
Inventory the source systems, available interfaces and sampling behavior. Identify asset IDs, timestamps, units and quality indicators before choosing an adapter approach.
Scope the hardware around the signal volume, model workload, retention needs and site constraints. The production hardware configuration is not finalized.
Decide who reviews advisories and how the supporting evidence fits the existing process. Keep action in the operator’s established control systems.
02 / IN PRACTICE
Define the scope, preserve the boundary, and make the outcome something a person can inspect.
Document available telemetry and access permissions. Confirm whether the required detail exists and what gaps or timing limits may affect the question.
Define the permitted connection, local retention and responsibilities. Do not assume cloud access or a command path is necessary for the local loop.
Use representative data to check mapping, timing and failure behavior. Verify the integration at the site before drawing conclusions from model output.
03 / A FEW DETAILS
No production cloud connector catalog is published. The intended local learning loop keeps raw telemetry on-site, and production uplink transport remains unfinished work.
That depends on the available interfaces, telemetry quality and access boundary. Start with an inventory in the pilot brief so the required adapter work can be scoped.
BUILD WITH RAIN
RAIN is preparing for its first field pilot. Start by defining the environment, the data boundary, and what success should look like.