RAIN / Hardware

The requirements come from your site.

A configuration guide for the hardware questions a pilot must answer. Final dimensions, components, power requirements, and certifications are not yet published.

Configuration to be defined

INTELLIGENCE BELONGS WHERE THE DATA LIVES.

01 / THE IDEA

Define a specification with evidence.

The current architecture identifies three roles: read-only connectivity, local compute, and local storage. Turning those roles into a deployable node requires workload measurements and an installation assessment. This page identifies the inputs to that work.

01

Compute and memory

Document candidate models, inference cadence, training jobs, and evaluation schedules. Measure peak demands and recovery behavior.

02

Connectivity and storage

Identify source protocols, access boundaries, signal volume, retention periods, and how operating records will be reviewed.

03

Environment and service

Capture mounting constraints, ambient conditions, available power, network placement, and the people responsible for maintenance.

02 / IN PRACTICE

Put the thinking into practice.

Define the scope, preserve the boundary, and make the outcome something a person can inspect.

  1. 01

    Collect site requirements

    Bring the available telemetry, infrastructure constraints, and operational review needs into one brief.

  2. 02

    Evaluate candidate equipment

    Check the proposed configuration against representative workloads and the conditions expected at the site.

  3. 03

    Record open decisions

    Agree what is established, what remains untested, and the acceptance criteria needed before deployment.

03 / A FEW DETAILS

Worth understanding.

Where is the datasheet?

There is no finalized hardware datasheet. Publishing fixed component or environmental ratings before selection and validation would misstate the current product stage.

Is the node certified for my environment?

No site-specific certification or environmental rating is claimed. Required approvals and suitable equipment must be established during scoping.

BUILD WITH RAIN

One site. One question.
A useful next step.

RAIN is preparing for its first field pilot. Start by defining the environment, the data boundary, and what success should look like.

Build your pilot brief